§ 117.615. Plum Island River.
122 words·~1 min read·
/us/cfr/t33/s§ 117.615·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The draw of the Plum Island Turnpike Bridge, mile 3.3 between Newburyport and Plum Island, shall operate as follows:
(a)From April 1 through November 30, 5 a.m. to 9 p.m., the draw shall open on signal if at least one hour advance notice is given by calling the number posted at the bridge. At all other times the draw shall open on signal if at least three hours advance notice is given.
(b)The owners of this bridge shall provide and keep in good legible condition, clearance gauges for each draw with figures not less than twelve
(12)inches high, designed, installed and maintained according to the provisions of § 118.160 of this chapter. \[CGD01-94-057, 60 FR 54431, Oct. 24, 1995\]
Connections1 cite this
Cited by 1 section
Citation graph
cites case law
§ 117.615
Plum Island River.
Fed. Reg.×1
Cites 0Cited by 1 across 1 source