§ 117.597. Dorchester Bay.
196 words·~1 min read·
/us/cfr/t33/s§ 117.597·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The draw of the of the William T. Morrisey Boulevard Bridge, mile 0.0, at Boston, shall operate as follows:
(a)From 7:30 a.m. to 9 a.m. and 4:30 p.m. to 6 p.m., Monday through Friday, except holidays, the draw need not open for the passage of vessel traffic.
(b)The draw shall open on signal from April 16 through May 31, from 8 a.m. through midnight, except as provided in paragraph
(a)of this section. From midnight through 8 a.m. at least an eight-hour advance notice is required for bridge openings.
(c)The draw shall open on signal at all times from June 1 through September 30, except as provided in paragraph
(a)of this section.
(d)The draw shall open on signal from October 1 through October 14, 8 a.m. through midnight, except as provided in paragraph
(a)of this section. From midnight through 8 a.m. at least an eight-hour advance notice is required for bridge openings.
(e)The draw shall open on signal from October 15 through April 15, after at least a 24 hours notice is given, except as provided in paragraph
(a)of this section. \[CGD01-02-026, 68 FR 59116, Oct. 14, 2003\]
Connections10 cite this
Cited by 10 sections · top 8
Citation graph
cites case law
§ 117.597
Dorchester Bay.
Fed. Reg.×10
Cites 0Cited by 10 across 1 source