§ 117.489. Plaquemine Brule Bayou.
55 words·~1 min read·
/us/cfr/t33/s§ 117.489·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The draw of the S91 bridge, mile 8.0 at Estherwood, shall open on signal from 5 a.m. to 9 p.m. if at least four hours notice is given. From 9 p.m. to 5 a.m., the draw shall open on signal if at least 12 hours notice is given. \[USCG-2008-0850, 73 FR 51362, Sept. 3, 2008\]