§ 117.444. Falgout Canal.
70 words·~1 min read·
/us/cfr/t33/s§ 117.444·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The draw of the LA 315 bridge across Falgout Canal, mile 3.1, shall open on signal; except that from 15 August to 5 June, the draw need not be opened from 7 a.m. to 8 a.m. and from 3 p.m. to 4 p.m., Monday through Friday except holidays. The draw shall open on signal at any time for an emergency aboard a vessel. \[CGD8-91-11, 56 FR 43872, Sept. 5, 1991\]
Connections4 cite this
Citation graph
cites case law
§ 117.444
Falgout Canal.
Fed. Reg.×4
Cites 0Cited by 4 across 1 source