§ 117.234. Cedar Creek.
59 words·~1 min read·
/us/cfr/t33/s§ 117.234·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The SR 36 Bridge, mile 0.5 in Cedar Beach, shall open on signal. From April 1 through November 30 from 2 a.m. to 4 a.m.; and from December 1 through March 31 from 6:30 p.m. to 6 a.m., the draw shall open on signal if at least four hours notice is given. \[CGD05-06-044, 71 FR 53325, Sept. 11, 2006\]