§ 117.215. Niantic River.
172 words·~1 min read·
/us/cfr/t33/s§ 117.215·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(a)The draw of the Amtrak Bridge, mile 0.0, at Niantic, shall open on signal at all times. When a train scheduled to cross the bridge without stopping has entered the drawbridge block, a delay in opening the draw may occur until the train has cleared the block. The delay should not exceed 10 minutes.
(b)The draw of the S156 Bridge, mile 0.1, at Niantic, shall open on signal; except that, from 7 a.m. to 8 a.m., and 4 p.m. to 5 p.m., Monday through Friday, except holidays, the draw shall open only for the passage of commercial vessels. From November 1 through April 30, from 8 p.m. to 4 a.m., the draw shall open on signal if at least six hours notice is given by calling the number posted at the bridge. \[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37381, Sept. 24, 1984; CGD01-99-087, 64 FR 61519, Nov. 12, 1999, as amended by USCG-2015-0218, 80 FR 35243, June 19, 2015; USCG-2019-0545, 84 FR 70427, Dec. 23, 2019\]
Connections14 cite this
Cited by 14 sections · top 9
register
- Rules and RegulationsNotice of temporary deviation from regulations
- Rules and RegulationsNotice of temporary deviation from regulations
- NoticesNotice of temporary deviation from regulations
- NoticesFinal rule
- Rules and RegulationsFinal rule; technical amendment
- NoticesNotice of temporary deviation from regulations
- Rules and RegulationsNotice of temporary deviation from regulations
- NoticesNotice of proposed rulemaking
- Rules and RegulationsFinal rule
Citation graph
cites case law
§ 117.215
Niantic River.
Fed. Reg.×14
Cites 0Cited by 14 across 1 source