§ 827.1. Scope.
31 words·~1 min read·
/us/cfr/t30/s§ 827.1·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
This part sets forth requirements for coal preparation plants operated in connection with a coal mine but outside the permit area for a specific mine. \[53 FR 47391, Nov. 22, 1988\]