(a)Refuse deposited on a pile shall be spread in layers and compacted in such a manner so as to minimize the flow of air through the pile.
(b)Refuse shall not be deposited on a burning pile except for the purpose of controlling or extinguishing a fire.
(c)Clay or other sealants shall be used to seal the surface of any refuse pile in which a spontaneous ignition has occurred.
(d)Surface seals shall be kept intact and protected from erosion by drainage facilities.
(e)Refuse piles shall not be constructed so as to impede drainage or impound water.
(f)Refuse piles shall be constructed in such a manner as to prevent accidental sliding and shifting of materials.
(g)No extraneous combustible material shall be deposited on refuse piles.
(h)After October 31, 1975 new refuse piles and additions to existing refuse piles, shall be constructed in compacted layers not exceeding 2 feet in thickness and shall not have any slope exceeding 2 horizontal to 1 vertical (approximately 27°) except that the District Manager may approve construction of a refuse pile in compacted layers exceeding 2 feet in thickness and with slopes exceeding 27° where engineering data substantiates that a minimum safety factor of 1.5 for the refuse pile will be attained.
(i)Foundations for new refuse piles and additions to existing refuse piles shall be cleared of all vegetation and undesirable material that according to current, prudent engineering practices would adversely affect the stability of the refuse pile.
(j)All fires in refuse piles shall be extinguished, and the method used shall be in accordance with a plan approved by the District Manager. The plan shall contain as a minimum, provisions to ensure that only those persons authorized by the operator, and who have an understanding of the procedure to be used, shall be involved in the extinguishing operation. (Secs. 101, 508, Pub. L. 91-173, 83 Stat. 745, 803 (30 U.S.C. 811, 957), Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.)) \[36 FR 9364, May 22, 1971, as amended at 40 FR 41776, Sept. 9, 1975; 60 FR 33723, June 29, 1995\]
Connections20 cite this · traces to 2
4 references not yet in our index
  • Pub. L. 91-173
  • 83 Stat. 745
  • Pub. L. 96-511
  • 94 Stat. 2812
Citation graph
cites case law
§ 77.215
Refuse piles; construction requirements.
Fed. Reg.×20
Pub. L.Pub. L. 91-173
Stat.83 Stat. 745
Pub. L.Pub. L. 96-511
Stat.94 Stat. 2812
Cites 6Cited by 20 across 1 source
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.