§ 75.384. Longwall and shortwall travelways.
140 words·~1 min read·
/us/cfr/t30/s§ 75.384·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(a)If longwall or shortwall mining systems are used and the two designated escapeways required by § 75.380 are located on the headgate side of the longwall or shortwall, a travelway shall be provided on the tailgate side of that longwall or shortwall. The travelway shall be located to follow the most direct and safe practical route to a designated escapeway.
(b)The route of travel shall be clearly marked.
(c)When a roof fall or other blockage occurs that prevents travel in the travelway---
(1)Work shall cease on the longwall or shortwall face;
(2)Miners shall be withdrawn from face areas to a safe area outby the section loading point; and
(3)MSHA shall be notified.
(d)Work may resume on the longwall or shortwall face after the procedures set out in §§ 75.215 and 75.222 are implemented.