§ 707.4. Responsibility.
44 words·~1 min read·
/us/cfr/t30/s§ 707.4·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(a)The regulatory authority is responsible for enforcing the requirements of this part.
(b)Any person conducting coal extraction as an incidental part of government-financed construction is responsible for possessing, on the site of the extraction operation, the documentation required by 30 CFR 707.12.
Connectionstraces to 1
Traces to 1 document