Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · CFR · Title 30 — Mineral Resources · Part 585 · § 585.301

§ 585.301. What do ROW grants and RUE grants include?

137 words·~1 min read·/us/cfr/t30/s§ 585.301·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)A ROW grant:
(1)Includes the full length of the corridor on which a cable, pipeline, or associated facility is located;
(2)Is of a width sufficient to accommodate potential changes at the design and installation phases of the project, with an option for the grant holder to relinquish unused portions of the ROW after construction is complete; and
(3)For the associated facilities, is limited to the area reasonably necessary for a power or pumping station or other facilities requested.
(b)A RUE grant includes the site on which a facility or other structure is located and the areal extent of anchors, chains, and other equipment associated with a facility or other structure. The specific boundaries of a RUE will be determined by BOEM on a case-by-case basis and set forth in each RUE grant.
Connections3 cite this
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.