§ 56.6802. Bulk delivery vehicles.
56 words·~1 min read·
/us/cfr/t30/s§ 56.6802·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
No welding or cutting shall be performed on a bulk delivery vehicle until the vehicle has been washed down and all explosive material has been removed. Before welding or cutting on a hollow shaft, the shaft shall be thoroughly cleaned inside and out and vented with a minimum 1/2-inch diameter opening to allow for sufficient ventilation.