§ 28.31. Quality control plans; contents.

320 words·~1 min read·/us/cfr/t30/s§ 28.31·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)Each quality control plan shall contain provisions for the management of quality, including:
(1)Requirements for the production of quality data and the use of quality control records;
(2)Control of engineering drawings, documentations, and changes;
(3)Control and calibration of measuring and test equipment;
(4)Control of purchased material to include incoming inspection;
(5)Lot identification, control of processes, manufacturing, fabrication, and assembly work conducted in the applicant's plant;
(6)Audit or final inspection of the completed product; and,
(7)The organizational structure necessary to carry out these provisions.
(b)The sampling plan shall include inspection tests and sampling procedures developed in accordance with Military Specification MIL-F-15160D, "Fuses; Instrument, Power, and Telephone" (which is hereby incorporated by reference and made a part hereof), Group A tests and Group B tests, except that the continuity and/or resistance characteristics of each fuse shall be tested. Military Specification MIL-F-15160D is available for examination at the U.S. Department of Labor, Mine Safety and Health Administration, Approval and Certification Center, 765 Technology Drive, Triadelphia, WV 26059. Copies of the document may be purchased from Information Dissemination (Superintendent of Documents), P.O. Box 371954, Pittsburgh, PA 15250-7954; Telephone: 866-512-1800, http://bookstore.gpo.gov.
(c)The sampling procedure shall include a list of the characteristics to be tested by the applicant or his agent and shall include but not be limited to:
(1)Continuity and/or resistance determination for each fuse;
(2)Carry current capability (not less than 110 percent of the rated current); and,
(3)Overload current interruption capability (not less than 135 percent of the rated current).
(d)The quality control inspection test method to be used by the applicant or his agent for each characteristic required to be tested shall be described in detail. \[37 FR 7562, Apr. 15, 1972, as amended at 43 FR 12316, Mar. 24, 1978; 60 FR 35694, July 11, 1995; 71 FR 16666, Apr. 3, 2006; 73 FR 52212, Sept. 9, 2008\]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.