§ 250.751. Coiled tubing testing requirements.
82 words·~1 min read·
/us/cfr/t30/s§ 250.751·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
You must test the coiled tubing unit in accordance with § 250.737(a), (b), (c), (d)(9), and (d)(10). You must successfully pressure test the dual check valves to the rated working pressure of the connector, the rated working pressure of the dual check valve, expected surface pressure, or the collapse pressure of the coiled tubing, whichever is less. The test interval for coiled tubing operations must include a 10 minute high-pressure test for the coiled tubing string. \[84 FR 21984, May 15, 2019\]