§ 250.238. What well or completions information must my DWOP include?
72 words·~1 min read·
/us/cfr/t30/s§ 250.238·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
You must include the following information in your DWOP, as applicable, to be consistent with the activities to be addressed in the associated well permit(s):
(a)A description and schematic of the typical wellbore, casing, and completion;
(b)Information concerning the drilling and completion systems; and
(c)Design and fabrication information for each wellbore riser system (e.g., drilling, completion, workover, intervention, injection, or production) deployed from a floating production facility or TLP.