Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · CFR · Title 29 — Labor · Part 776 · § 776.28

§ 776.28. Covered preparatory activities.

348 words·~2 min read·/us/cfr/t29/s§ 776.28·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)Before production begins.
(1)The United States Supreme Court has held that the Act is applicable to employees of a company which was engaged in preliminary oil well drilling, even though the holes were drilled to a specified depth which was short of where the oil was expected to be found. 26 The Act would also apply to drilling operations even though no oil was discovered. 27 Laborers employed in erecting drilling rigs would also be covered. 28 Other preparatory work before drilling begins in an oil field, such as staking oil claims, surveying, clearing the land, assembling materials and equipment, erecting sheds, derricks or dikes would also be within the scope of the Act. 29 Preliminary work such as the foregoing has the requisite close and immediate tie with the production of goods for commerce to be within the coverage of the Act. 26 Warren-Bradshaw Drilling Co. v. Hall, 317 U.S. 8. 27 Culver v. Bell Loffland, 146 F.
(2d)20. 28 Devine v. Levy, 39 F. Supp. 44. 29 Straughn v. Schlumberger Well Surveying Corp., 72 F. Supp. 511.
(2)Similarly, coverage extends to employees engaged in the installation of machinery to be used in covered production in a new factory building, even though the construction of the building itself may not have been subject to the Act. Such installation is considered to be a preliminary production activity rather than simply part of the construction of the building.
(3)If the construction project is subject to the Act, preliminary activities, such as surveying, clearing, draining and leveling the land, erecting necessary buildings to house materials and equipment, or the demolition of structures in order to begin building the covered facility, are subject to the Act. 30 30 Coverage of preparation of plans and designs is discussed in § 776.19(b) (2).
(b)Facilities used in aid of the covered construction. The installation of facilities, and the repair and maintenance of trucks, tools, machinery and other equipment to be used by a contractor in the furtherance of his covered construction work, are activities subject to the Act.
Connections3 off-index
3 references not yet in our index
  • 317 U.S. 8
  • 39 F. Supp. 44
  • 72 F. Supp. 511
Citation graph
cites case law
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.