§ 58.37. Environmental impact statement determinations.

338 words·~2 min read·/us/cfr/t24/s§ 58.37·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)An EIS is required when the project is determined to have a potentially significant impact on the human environment.
(b)An EIS is required under any of the following circumstances, except as provided in paragraph
(c)of this section:
(1)The project would provide a site or sites for, or result in the construction of, hospitals or nursing homes containing a total of 2,500 or more beds.
(2)The project would remove, demolish, convert or substantially rehabilitate 2,500 or more existing housing units (but not including rehabilitation projects categorically excluded under § 58.35), or would result in the construction or installation of 2,500 or more housing units, or would provide sites for 2,500 or more housing units.
(3)The project would provide enough additional water and sewer capacity to support 2,500 or more additional housing units. The project does not have to be specifically intended for residential use nor does it have to be totally new construction. If the project is designed to provide upgraded service to existing development as well as to serve new development, only that portion of the increased capacity which is intended to serve new development should be counted.
(c)If, on the basis of an EA, a responsible entity determines that the thresholds in paragraph
(b)of this section are the sole reason for the EIS, the responsible entity may prepare a FONSI pursuant to 40 CFR 1501.4. In such cases, the FONSI must be made available for public review for at least 30 days before the responsible entity makes the final determination whether to prepare an EIS.
(d)Notwithstanding paragraphs
(a)through
(c)of this section, an EIS is not required where § 58.53 is applicable.
(e)Recommended EIS Format. The responsible entity must use the EIS format recommended by the CEQ regulations (40 CFR 1502.10) unless a determination is made on a particular project that there is a compelling reason to do otherwise. In such a case, the EIS format must meet the minimum requirements prescribed in 40 CFR 1502.10.
Connections3 cite this
2 references not yet in our index
  • 40 CFR 1501.4
  • 40 CFR 1502.10
Citation graph
cites case law
§ 58.37
Environmental impact statement determinations.
Fed. Reg.×3
Cite40 CFR 1501.4
Cite40 CFR 1502.10
Cites 2Cited by 3 across 1 source
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.