§ 636.208. May I use my existing prequalification procedures with design-build contracts?
24 words·~1 min read·
/us/cfr/t23/s§ 636.208·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Yes, you may use your existing prequalification procedures for either construction or engineering design firms as a supplement to the procedures in this part.