Code · CFR · Title 18 — Conservation of Power and Water Resources · Part 801 — General Policies · § 801.12

§ 801.12. Electric power generation.

337 words·~2 min read·/us/cfr/t18/s§ 801.12·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)Significant uses are presently being made of the waters of the basin for the generation of electric power at hydro, pumped storage, and thermoelectric generating stations. Increased demands for electric power throughout the East Coast can be expected to result in proposals for the development of additional electric power generating stations located either in the basin or nearby its borders.
(b)There appears to be limited site potential in the basin for additional hydroelectric generation, and considerable potential for additional pumped storage and thermoelectric generation. The direct and indirect effects of existing and proposed electric generation projects will be considered by the Commission. Items of concern will include consumptive uses of water, alteration of natural stream regimen, effects on water quality, and on the other uses of the streams affected.
(c)The Commission, in cooperation with appropriate agencies of the signatory parties, and with other public and private agencies shall:
(1)Conduct a thorough review of applications to relicense existing electric power generating projects and facilities, and applications to amend existing licenses to determine if the proposal is in accord with the comprehensive plan.
(2)Require that the proposed siting and location in the basin of any type of electric generating facility or any facility located outside the basin having an effect on the waters of the basin, shall be planned in direct consultation with the Commission to enable advance consideration of the possible effects of such installation on the water resources of the basin.
(d)Project sponsors proposing new or significantly modified power generation plants in the basin shall submit to the Commission for review an evaluation of their projected water use and consider all available and feasible technologies, including dry cooling, that could lower the consumptive use of water at the plant. For the purposes of this evaluation, a significantly modified power plant is one that is changing its fuel source or substantially increasing its consumptive use of water. \[38 FR 4662, Feb. 20, 1973, as amended at 89 FR 78234, Sept. 25, 2024\]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.