Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · CFR · Title 18 — Conservation of Power and Water Resources · Part 12 — Safety of Water Power Projects and Project Works · § 12.23

§ 12.23. Time for filing emergency action plan.

369 words·~2 min read·/us/cfr/t18/s§ 12.23·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)Unconstructed project.
(1)Except as set forth in paragraph (a)(2), the emergency action plan for an unconstructed project must be filed no later than 60 days before the initial filling of the project reservoir begins.
(2)Temporary impoundment during construction.
(i)For any unconstructed project, if a temporary impoundment would be created during construction, such as through construction of temporary or permanent cofferdams or large sediment control structures, and an accident to or failure of the impounding structures might endanger construction workers or otherwise endanger public health or safety, a temporary construction emergency action plan must be filed no later than 60 days before construction begins.
(ii)No later than 60 days before the initial filling of a project reservoir begins at a project for which a temporary emergency action plan has been filed the applicant or licensee must file modifications to that plan or a new plan, taking into account the differences in circumstances between the construction and post-construction periods.
(b)Unlicensed constructed project.
(1)If the Commission has determined on or before March 1, 1981 that a license is required for an unlicensed constructed project, the emergency action plan for that project must be filed no later than:
(i)Six months after March 1, 1981; or
(ii)Any earlier date specified by the Commission or its authorized representative.
(2)Except as set forth in paragraph (b)(1) of this section, the emergency action plan for an unlicensed constructed project must be filed no later than the earliest of:
(i)Six months after the date that a license application is filed;
(ii)Six months after the date that the Commission issues an order determining that licensing is required; or
(iii)A date specified by the Commission or its authorized representative.
(c)Licensed constructed project. If a licensed constructed project does not have an acceptable emergency action plan on file on March 1, 1981 the emergency action plan must be filed no later than:
(1)Six months after March 1, 1981; or
(2)Any earlier date specified by the Commission or its authorized representative.
(d)For good cause shown, the Regional Engineer may grant an extension of time for filing all or any part of an emergency action plan.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.