§ 784.5. Subsidiary arrangements.
179 words·~1 min read·
/us/cfr/t15/s§ 784.5·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(a)General subsidiary arrangement. The United States Government may conclude a general subsidiary arrangement with the IAEA that governs complementary access activities, irrespective of the location (i.e., an arrangement that is not location-specific).
(b)Location-specific subsidiary arrangement---(1) Purpose. If requested by the location or deemed necessary by the U.S. Government, the U.S. Government will negotiate a location-specific subsidiary arrangement with the IAEA. The purpose of such an arrangement is to establish procedures for conducting managed access at a specific declared location. If the location requests, it may participate in preparations for the negotiation of a location-specific subsidiary arrangement with the IAEA and may observe the negotiations to the maximum extent practicable. The existence of a location-specific subsidiary arrangement does not in any way limit the right of the owner, operator, occupant, or agent in charge of the location to withhold consent to a request for complementary access.
(2)Format and content. The form and content of a location-specific subsidiary arrangement will be determined by the IAEA and the U.S. Government, in consultation with the location, on a case-by-case basis.