§ 400.25. Application for subzone designation.
113 words·~1 min read·
/us/cfr/t15/s§ 400.25·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
In addition to the requirements of §§ 400.21(d)(1)(i) and
(ii)pertaining to legal authority, § 400.21(d)(2)(vii) pertaining to environmental aspects of the proposal, and § 400.21(d)(3)(i) and
(iii)pertaining to operation, a grantee's application for subzone designation shall contain the following information:
(a)The name of the operator/user for which subzone designation is sought;
(b)The nature of the activity at the proposed subzone;
(c)The address(es) and physical size (acreage or square feet) of the proposed subzone location(s); and
(d)One or more maps conforming to the requirements of section § 400.21(d)(5)(ii). For any production activity to be conducted at a proposed subzone, the separate requirements of § 400.14(a) must be met.