Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · CFR · Title 14 — Aeronautics and Space · Part 129 — Operations: Foreign Air Carriers and Foreign Operators of U.S.-Registered Aircraft Engaged in Common Carriage · § 129.107

§ 129.107. Repairs assessment for pressurized fuselages.

425 words·~2 min read·/us/cfr/t14/s§ 129.107·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)No foreign air carrier or foreign persons operating a U.S. registered airplane may operate an Airbus Model A300 (excluding −600 series), British Aerospace Model BAC 1-11, Boeing Model 707, 720, 727, 737, or 747, McDonnell Douglas Model DC-8, DC-9/MD-80 or DC-10, Fokker Model F28, or Lockheed Model L-1011 beyond the applicable flight cycle implementation time specified below, or May 25, 2001, whichever occurs later, unless operations specifications have been issued to reference repair assessment guidelines applicable to the fuselage pressure boundary (fuselage skin, door skin, and bulkhead webs), and those guidelines are incorporated in its maintenance program. The repair assessment guidelines must be approved by the responsible Aircraft Certification Service office for the type certificate for the affected airplane.
(1)For the Airbus Model A300 (excluding the -600 series), the flight cycle implementation time is:
(i)Model B2: 36,000 flights.
(ii)Model B4-100 (including Model B4-2C): 30,000 flights above the window line, and 36,000 flights below the window line.
(iii)Model B4-200: 25,500 flights above the window line, and 34,000 flights below the window line.
(2)For all models of the British Aerospace BAC 1-11, the flight cycle implementation time is 60,000 flights.
(3)For all models of the Boeing 707, the flight cycle implementation time is 15,000 flights.
(4)For all models of the Boeing 720, the flight cycle implementation time is 23,000 flights.
(5)For all models of the Boeing 727, the flight cycle implementation time is 45,000 flights.
(6)For all models of the Boeing 737, the flight cycle implementation time is 60,00 flights.
(7)For all models of the Boeing 747, the flight cycle implementation time is 15,000 flights.
(8)For all models of the McDonnell Douglas DC-8, the flight cycle implementation time is 30,000 flights.
(9)For all models of the McDonnell Douglas DC-9/MD-80, the flight cycle implementation time is 60,000 flights.
(10)For all models of the McDonnell Douglas DC-10, the flight cycle implementation time is 30,000 flights.
(11)For all models of the Lockheed L-1011, the flight cycle implementation time is 27,000 flights.
(12)For the Fokker F-28 Mark 1000, 2000, 3000, and 4000, the flight cycle implementation time is 60,000 flights.
(b)[Reserved] [Docket 29104, 65 FR 24126, Apr. 25, 2000; 65 FR 35703, June 5, 2000, as amended by Amdt. 129-30, 66 FR 23131, May 7, 2001; Amdt. 129-35, 67 FR 72834, Dec. 9, 2002; Amdt. 129-39, 69 FR 45942, July 30, 2004. Redesignated and amended by Amdt. 129-43, 72 FR 63413, Nov. 8, 2007; Docket FAA-2018-0119, Amdt. 129-53, 83 FR 9174, Mar. 5, 2018]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.