§ 121.705. Mechanical interruption summary report.
155 words·~1 min read·
/us/cfr/t14/s§ 121.705·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Each certificate holder shall submit to the Administrator, before the end of the 10th day of the following month, a summary report for the previous month of:
(a)Each interruption to a flight, unscheduled change of aircraft en route, or unscheduled stop or diversion from a route, caused by known or suspected mechanical difficulties or malfunctions that are not required to be reported under § 121.703.
(b)The number of engines removed prematurely because of malfunction, failure or defect, listed by make and model and the aircraft type in which it was installed.
(c)The number of propeller featherings in flight, listed by type of propeller and engine and aircraft on which it was installed. Propeller featherings for training, demonstration, or flight check purposes need not be reported. [Docket 6258, 29 FR 19226, Dec. 31, 1964, as amended by Amdt. 121-10, 30 FR 10025, Aug. 12, 1965; Amdt. 121-319, 70 FR 76979, Dec. 29, 2005]
Connections1 cite this
Citation graph
cites case law
§ 121.705
Mechanical interruption summary report.
Fed. Reg.×1
Cites 0Cited by 1 across 1 source