§ 963.10. Scope.
86 words·~1 min read·
/us/cfr/t10/s§ 963.10·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(a)The scope of this subpart includes the following for both the preclosure and postclosure periods:
(1)The bases for the suitability determination for the Yucca Mountain site as a location for a geologic repository;
(2)The suitability evaluation methods for applying the site suitability criteria to a geologic repository at the Yucca Mountain site; and
(3)The site suitability criteria that DOE will apply in accordance with section 113(b)(1)(A)(iv) of the NWPA.
(b)DOE will seek NRC concurrence on any future revisions to this subpart.
Connections1 cite this
Cited by 1 section
register
Citation graph
cites case law
§ 963.10
Scope.
Fed. Reg.×1
Cites 0Cited by 1 across 1 source