Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · CFR · Title 10 — Energy · Part 904 — General Regulations for the Charges for the Sale of Power from the Boulder Canyon Project · § 904.9

§ 904.9. Excess capacity.

123 words·~1 min read·/us/cfr/t10/s§ 904.9·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)If the Uprating Program results in Excess Capacity, Western shall be entitled to such Excess Capacity to integrate the operation of the Boulder City Area Projects and other Federal Projects on the Colorado River. Specific criteria for the use of Excess Capacity by Western will be provided by Contract. All Excess Capacity not required by Western for the purposes specified by Contract will be available to all Contractors at no additional cost on a pro rata basis based on the ratio of each Contractor's Capacity allocation to the total Capacity allocation.
(b)Credits for benefits resulting from project integration shall be determined by Western and such benefits shall be apportioned in accordance with paragraph
(9)of § 904.5 of these General Regulations.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.