Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · CFR · Title 10 — Energy · Part 500 — Definitions · § 500.3

§ 500.3. Electric regions—electric region groupings for reliability measurements under the Powerplant and Industrial Fuel Use Act of 1978.

400 words·~2 min read·/us/cfr/t10/s§ 500.3·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)The following is a list of electric regions for use with regard to the Act. The regions are identified by FERC Power Supply Areas (PSA's) as authorized by section 202(a) of the Federal Power Act except where noted. They will be reviewed annually by ERA. Each grouping meets one or more of the following criteria:
(1)Existing centrally dispatched pools and hourly power brokers;
(2)Systems with joint planning and construction agreements;
(3)Systems with coordination agreements in the areas of:
(i)Generation reserve and system reliability criteria;
(ii)Capacity and energy exchange policies;
(iii)Maintenance scheduling; and
(iv)Emergency procedures for dealing with capacity or fuel shortages; or
(4)Systems within the same National Electric Reliability Council
(NERC)region with historical coordination policies.
(b)The PSA's referred to in the definition of electric regions in paragraph
(a)of this section were first defined by the Federal Power Commission in 1936. The most recent reference to them is given in the 1970 National Power Survey, Vol. 1, Pg. 1-3-16. In cases where a petitioner finds an ambiguity in a regional assignment, he shall consult with DOE for an official determination. Electric Region Groupings and FERC PSA's: 1. Allegheny Power System (APS)—7, except Duquesne Light Company. 2. American Electric Power System (AEP)—entire AEP System. 3. New England Planning Pool (NEPOOL)—1, 2. 4. New York Planning Pool (NYPP)—3, 4. 5. Pennsylvania—New Jersey—Maryland interconnection (PJM)—5, 6. 6. Commonwealth Edison Company—14. 7. Florida Coordination Group (FCG)—24. 8. Middle South Utilities—25. 9. Southern Company—22, 23. 10. Gulf States Group—35. 11. Tennessee Valley Authority (TVA)—20. 12. Virginia—Carolina Group (VACAR)—18, 21. 13. Central Area Power Coordination Group (CAPCO)—Cleveland Electric Illuminating Company, Toledo Edison Company, Ohio Edison Company, Duquesne Light Company. 14. Cincinnati, Columbus, Dayton Group (CCD)—Cincinnati Gas and Electric Company, Columbus and Southern Ohio Electric Company, Dayton Power and Light Company. 15. Kentucky Group—19. 16. Indiana Group—Indiana Utilities except AEP. 17. Illinois—Missouri Group (ILLMO)—15, 40. 18. Michigan Electric Coordinated Systems (MECS)—11. 19. Wisconsin—Upper Michigan Group (WUMS)—13. 20. Mid-Continent Area Power Pool (MAAP)—16, 17, 26, 27, 28. 21. Missouri—Kansas Group (MOKAN)—24, 29. 22. Oklahoma Group—33, 36. 23. Texas Interconnected Systems (TIS)—37, 38. 24. Rocky Mountain Power Pool (RMPP)—31, 32. 25. Northwest Power Pool (NWPP)—30, 42, 43, 44, 45. 26. Arizona—New Mexico Group—39, 48 within Arizona. in Nevada and California. 27. Southern California—Nevada—47, 48. 28. Northern California—Nevada—46. 29. Alaska (non-interconnected systems to be considered separately)—49. 30. Idaho—Utah Group—41.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.