Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · CFR · Title 10 — Energy · Part 431 — Energy Efficiency Program for Certain Commercial and Industrial Equipment · § 431.226

§ 431.226. Energy conservation standards and their effective dates.

104 words·~1 min read·/us/cfr/t10/s§ 431.226·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Any traffic signal module or pedestrian module manufactured on or after January 1, 2006, shall meet both of the following requirements:
(a)Have a nominal wattage and maximum wattage no greater than: Maximum wattage (at 74 °C) Nominal wattage (at 25 °C) Traffic Signal Module Type: 12″ Red Ball1711 8″ Red Ball138 12″ Red Arrow129 12″ Green Ball1515 8″ Green Ball1212 12″ Green Arrow1111 Pedestrian Module Type: Combination Walking Man/Hand1613 Walking Man129 Orange Hand1613
(b)Be installed with compatible, electrically connected signal control interface devices and conflict monitoring systems. [70 FR 60417, Oct. 18, 2005, as amended at 71 FR 71374, Dec. 8, 2006]
Connections2 cite this
Citation graph
cites case law
§ 431.226
Energy conservation standards and their effective dates.
Fed. Reg.×2
Cites 0Cited by 2 across 1 source
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.