CHAP. 29.— An Act To authorize Frank Hitch to construct and maintain a bridge across Fishing Creek within the boundary lines of Edgecombe County, North Carolina. March 1, 1900. *Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled*, Frank Hitch may bridge Fishing Creek, Edgecombe County, N. C. That Frank Hitch be, and is hereby, authorized to construct and maintain a railroad bridge for the passage of railway engines and cars across Fishing Creek at such point as may be selected by said Hitch and approved by the Secretary of War within the boundary lines of Edgecombe County, North Carolina, said bridge to be so constructed as not to obstruct the navigation of said *Proviso*.
To be lawful structure, etc. river, and to be provided with a suitable draw: *Provided*, That any bridge constructed under this Act and according to its limitations shall be a lawful structure, and shall be known and recognized as a post route, and the same is hereby declared to be a post route, and the United States shall have the right of way for a postal telegraph across said bridge. Sec. 2. Secretary of War to approve plans, changes, etc. That the bridge authorized to be constructed under this Act shall be located and built under and subject to such regulations for the security of the navigation of said creek as the Secretary of War shall prescribe; and the said Hitch shall submit to the Secretary of War, for his examination and approval, a design and drawing of the, proposed bridge and a map of the location, giving, for the space of one-fourth of a mile above and one-fourth of a mile below the proposed location, the topography of the banks of the river, the shore lines at high and low water, the direction and strength of the currents, and the soundings, accurately showing the bed of the stream, and shall furnish such other information as may be required for, a full and satisfactory understanding of the subject; and until the said plan and location of the bridge are approved by the Secretary of War no work upon the bridge shall be commenced; and should any change, be made in the plan of said bridge during the progress of construction, such change shall be subject to the approval of the Secretary of War.
Sec. 3. Amendment. Obstruction to navigation. That Congress reserves the right to alter, amend, or repeal this Act at any time; and that if at any time navigation of said creek shall in any manner be obstructed or impaired by the said bridge, the Secretary of War shall have authority, and it shall be his duty, to require the said bridge company to alter and change the said bridge, at its own expense, in such manner as may be proper to secure free and complete navigation without impediment.
Sec. 4. Draw That the draw provided for the bridge herein authorized to be constructed shall be opened promptly, upon reasonable signal, for the passing of boats, which said Hitch shall maintain at his own a expense; and if actual construction of the bridge herein authorized Commencement and completion. shall not be commenced within one year from the passage of this Act 37 and be completed within three years from same date, the rights and privileges hereby granted shall cease and be determined.
Approved, March 1, 1900.