Sec. 60102. is amended—
277 words·~1 min read·
/statute-compilations/comps-9818/sec-60102A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 60102 is amended— ####
(1)by striking subsection (j)(3); and ####
(2)by adding at the end the following: > > ### “(n) Automatic and Remote-Controlled Shut-off Valves for New Transmission Pipelines > > > #### “(1) In general > > Not later than 2 years after the date of enactment of this subsection, and after considering the factors specified in subsection (b)(2), the Secretary, if appropriate, shall require by regulation the use of automatic or remote-controlled shut-off valves, or equivalent technology, where economically, technically, and operationally feasible on transmission pipeline facilities constructed or entirely replaced after the date on which the Secretary issues the final rule containing such requirement. > > > #### “(2) High-consequence area study > > > ##### “(A) Study > > The Comptroller General of the United States shall conduct a study on the ability of transmission pipeline facility operators to respond to a hazardous liquid or gas release from a pipeline segment located in a high-consequence area. > > > ##### “(B) Considerations > > In conducting the study, the Comptroller General shall consider the swiftness of leak detection and pipeline shutdown capabilities, the location of the nearest response personnel, and the costs, risks, and benefits of installing automatic and remote-controlled shut-off valves. > > > ##### “(C) Report > > Not later than 1 year after the date of enactment of this subsection, the Comptroller General shall submit to the Committee on Transportation and Infrastructure and the Committee on Energy and Commerce of the House of Representatives and the Committee on Commerce, Science, and Transportation of the Senate a report on the results of the study.” > .