Sec. 8001. DEFINITIONS
138 words·~1 min read·
/statute-compilations/comps-9003/sec-8001A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 8001 DEFINITIONS **[**[33 U.S.C. 652 note](/us/usc/t33/s652)**]** In this title, the following definitions apply: ####
(1)Plan The term “**Plan**” means the project for navigation and ecosystem improvements for the Upper Mississippi River and Illinois Waterway System: Report of the Chief of Engineers, dated December 15, 2004. ####
(2)Upper mississippi river and illinois waterway system The term “**Upper Mississippi River and Illinois Waterway System**” means the projects for navigation and ecosystem restoration authorized by Congress for— #####
(A)the segment of the Mississippi River from the confluence with the Ohio River, River Mile 0.0, to Upper St. Anthony Falls Lock in Minneapolis-St. Paul, Minnesota, River Mile 854.0; and #####
(B)the Illinois Waterway from its confluence with the Mississippi River at Grafton, Illinois, River Mile 0.0, to T.J. O'Brien Lock in Chicago, Illinois, River Mile 327.0.
Connectionstraces to 1
Traces to 1 document