Sec. 5145. CONNECTICUT RIVER DAMS, VERMONT
113 words·~1 min read·
/statute-compilations/comps-9003/sec-5145A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 5145 CONNECTICUT RIVER DAMS, VERMONT ###
(a)In General The Secretary shall evaluate, design, and carry out structural modifications at Federal cost to the Union Village Dam (Ompompanoosuc River), North Hartland Dam (Ottauquechee River), North Springfield Dam (Black River), Ball Mountain Dam (West River), and Townshend Dam (West River), Vermont, to regulate flow and temperature to mitigate downstream impacts on aquatic habitat and fisheries. ###
(b)Inclusion During the evaluation and design portion of the modifications authorized by this section, the Secretary shall ensure that a sustainable flow analysis is conducted for each dam. ###
(c)Authorization of Appropriations There is authorized to be appropriated to carry out this section $30,000,000.