Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · STATUTE-COMPILATIONS · Water Resources Development Act of 2007 · Sec. 5070

Sec. 5070. RECONSTRUCTION OF ILLINOIS AND MISSOURI FLOOD PROTECTION PROJECTS

371 words·~2 min read·/statute-compilations/comps-9003/sec-5070

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

## SEC. 5070 RECONSTRUCTION OF ILLINOIS AND MISSOURI FLOOD PROTECTION PROJECTS ###
(a)In General The Secretary may participate in the reconstruction of an eligible flood control project if the Secretary determines that such reconstruction is not required as a result of improper operation and maintenance of the project by the non-Federal interest. ###
(b)Cost Sharing The non-Federal share of the costs for the reconstruction of a flood control project authorized by this section shall be the same non-Federal share that was applicable to construction of the project. The non-Federal interest shall be responsible for operation and maintenance and repair of a project for which reconstruction is undertaken under this section. ###
(c)Reconstruction Defined In this section, the term “**reconstruction**”, as used with respect to a project, means addressing major project deficiencies caused by long-term degradation of the foundation, construction materials, or engineering systems or components of the project, the results of which render the project at risk of not performing in compliance with its authorized project purposes. In addressing such deficiencies, the Secretary may incorporate current design standards and efficiency improvements, including the replacement of obsolete mechanical and electrical components at pumping stations, if such incorporation does not significantly change the scope, function, and purpose of the project as authorized. ###
(d)Eligible Projects The following flood control projects are eligible for reconstruction under this section: ####
(1)Clear Creek Drainage and Levee District, Illinois. ####
(2)Fort Chartres and Ivy Landing Drainage District, Illinois. ####
(3)Prairie Du Pont Levee and Sanitary District, including Fish Lake Drainage and Levee District, Illinois. ####
(4)Cairo, Illinois Mainline Levee, Cairo, Illinois. ####
(5)Goose Pond Pump Station, Cairo, Illinois. ####
(6)Cottonwood Slough Pump Station, Alexander County, Illinois. ####
(7)10th and 28th Street Pump Stations, Cairo, Illinois. ####
(8)Flood control levee projects in Brookport, Shawneetown, Old Shawneetown, Golconda, Rosiclare, Harrisburg, and Reevesville, Illinois. ####
(9)City of St. Louis, Missouri. ####
(10)Missouri River Levee Drainage District, Missouri. ###
(e)Justification The reconstruction of a project authorized by this section shall not be considered a separable element of the project. ###
(f)Authorization of Appropriations There is authorized to be appropriated $50,000,000 to carry out this section.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.