Sec. 5008. EXPEDITED COMPLETION OF REPORTS FOR CERTAIN PROJECTS
148 words·~1 min read·
/statute-compilations/comps-9003/sec-5008A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 5008 EXPEDITED COMPLETION OF REPORTS FOR CERTAIN PROJECTS ###
(a)In General The Secretary shall expedite completion of the reports for the following projects and, if the Secretary determines that a project is justified in the completed report, proceed directly to project preconstruction, engineering, and design: ####
(1)Project for water supply, Little Red River, Arkansas. ####
(2)Watershed study, Fountain Creek, north of Pueblo, Colorado. ####
(3)Project for shoreline stabilization at Egmont Key, Florida. ####
(4)Project for navigation, Sabine-Neches Waterway, Texas and Louisiana. ####
(5)Project for ecosystem restoration, University Lake, Baton Rouge, Louisiana. ###
(b)Special Rule for Egmont Key, Florida In carrying out the project for shoreline stabilization at Egmont Key, Florida, referred to in subsection (a)(3), the Secretary shall waive any cost share to be provided by non-Federal interests for any portion of the project that benefits federally owned property.