Sec. 744. STUDY OF COMPLIANCE PROBLEM OF SMALL ELECTRIC UTILITY SYSTEMS
118 words·~1 min read·
/statute-compilations/comps-872/sec-744A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 744 STUDY OF COMPLIANCE PROBLEM OF SMALL ELECTRIC UTILITY SYSTEMS ###
(a)Study The Secretary shall conduct a study of the problems of compliance with this Act experienced by those electric utility systems which have a total system generating capacity of less than 2,000 megawatts. The Secretary shall report his findings and his recommendations to the Congress not later than 2 years after the effective date of this Act. ###
(b)Authorization of Appropriations There is authorized to be appropriated to the Secretary for the fiscal year 1979 not to exceed $500,000 to carry out the provisions of this section. **[**[42 U.S.C. 8454](/us/usc/t42/s8454)**]** **[**Section 745 repealed by section 2021(j)(1) of Public Law 104–66 (109 Stat. 727).**]**
Connectionstraces to 1
Traces to 1 document
2 references not yet in our index
- Pub. L. 104-66
- 109 Stat. 727
Citation graph
cites case law
Sec. 744
STUDY OF COMPLIANCE PROBLEM OF SMALL ELECTRIC UTILITY SYSTEMS
Pub. L.Pub. L. 104-66
Stat.109 Stat. 727
Cites 3Cited by 0 across 0 sources