## SEC. 514 MALLARD SLOUGH, PITTSBURG, CALIFORNIA The Secretary shall carry out under section 205 of the Flood Control Act of 1948 (33 U.S.C. 701s) a project for flood damage reduction in Mallard Slough, Pittsburg, California, if the Secretary determines that the project is technically sound, environmentally acceptable, and economically justified. All planning, study, design, and construction on the project shall be carried out by the office of the district engineer, San Francisco, California. * * * * * * *