Sec. 1322. STOCKTON LAKE, MISSOURI
534 words·~2 min read·
/statute-compilations/comps-18105/sec-1322A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 1322 STOCKTON LAKE, MISSOURI ###
(a)In General The Secretary shall implement the reallocation of storage at Stockton Lake, Missouri, and enter into a water storage agreement with the Commission consistent with section 301(b) of the Water Supply Act of 1958 (43 U.S.C. 390b(b)) and Public Law 88-140 (77 Stat. 249), as described in the final Stockton Lake Water Supply Storage Reallocation Feasibility Study with Integrated Environment Assessment and Director’s Memorandum dated September 23, 2024, subject to the following modifications: ####
(1)The contract between the United States and the Commission shall provide for the reallocation of two storage spaces, Storage Space No. 1 and Storage Space No. 2, in two phases. ####
(2)The total volume of storage to be reallocated, and the total volume of storage included in each storage space, shall be consistent with the Director’s Memorandum. ####
(3)The Commission shall have the option to select a commencement date for Storage Space No. 2 at any time between the tenth and fifteenth anniversary of the effective date of the storage contract. ####
(4)The first cost for Storage Space No. 1 shall be the updated cost of storage as of fiscal year 2010. ####
(5)The first cost for Storage Space No. 2 shall be the updated cost of storage as of the effective date of the storage contract. ####
(6)No payment shall be required for Storage Space No. 2 until the date described in paragraph (3), provided that after the tenth anniversary of the effective date of the storage contract, interest shall be charged on the outstanding balance for Storage Space No. 2 at the rate specified in Article 5(a) of the Model Format for Water Storage Agreements of the Corps of Engineers. ####
(7)The Commission may elect to pay for any portion of Storage Space No. 2 at the same price, on the same schedule, and under the same terms as the payment for Storage Space No. 1, but notwithstanding any such election, Storage Space No. 2 shall not be utilized for municipal and industrial water supply purposes prior to the commencement date described in paragraph (3). ####
(8)All costs associated with implementing the recommendation described in the Memorandum of the Director of Civil Works to raise the level of the multipurpose pool shall be paid at Federal expense. ###
(b)Credit to the Hydropower Purpose ####
(1)In general In carrying out this section— #####
(A)losses to the Federal hydropower purpose of the Stockton Lake project shall be offset by a reduction in the costs allocated to the Federal hydropower purpose; and #####
(B)the reduction described in subparagraph
(A)shall be determined by the Administrator of the Southwest Power Administration. ####
(2)No increased payments The Secretary may not increase the amounts of payments from water users under a water supply contract under this section due to the credits and reimbursement required to be paid by this section. ###
(c)Savings Clause Nothing in this section shall affect the Secretary’s authority under the Water Supply Act of 1958 (43 U.S.C. 390b). ###
(d)Definition In this section, the term “Commission” refers to the Southwest Missouri Joint Municipal Water Utility Commission.
Connectionstraces to 2
Traces to 2 documents
1 reference not yet in our index
- Pub. L. 88-140
Citation graph
cites case law
Cites 3Cited by 0 across 0 sources