Sec. 1644. OPERATIONAL TIMELINE FOR STRATEGIC AUTOMATED COMMAND AND CONTROL SYSTEM
176 words·~1 min read·
/statute-compilations/comps-17632/sec-1644A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 1644 OPERATIONAL TIMELINE FOR STRATEGIC AUTOMATED COMMAND AND CONTROL SYSTEM ###
(a)In General The Secretary of the Air Force shall develop a replacement of the Strategic Automated Command and Control System (SACCS) by not later than the date on which the LGM-35A Sentinel intercontinental ballistic missile program reaches initial operational capability. ###
(b)Replacement Capabilities The replacement required by subsection
(a)shall— ####
(1)replace the SACCS base processors; ####
(2)replace the SACCS processors at launch control centers; ####
(3)provide internet protocol connectivity for wing-wide command centers of the LGM-35A Sentinel intercontinental ballistic missile program; and ####
(4)include such other capabilities necessary to address the evolving requirements of the LGM-35A Sentinel intercontinental ballistic missile program as the Secretary considers appropriate. ###
(c)Periodic Updates Beginning not later than March 1, 2025, and not later than each of March 1 and September 1 annually thereafter, the Secretary of the Air Force shall provide to the congressional defense committees a briefing on the progress of the modernization effort described in subsection (a).