Sec. 322. INTERREGIONAL TRANSFER CAPABILITY DETERMINATION STUDY

266 words·~1 min read·/statute-compilations/comps-17485/sec-322

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

## SEC. 322 INTERREGIONAL TRANSFER CAPABILITY DETERMINATION STUDY ###
(a)In General The Electric Reliability Organization (as that term is defined in section 215(a)(2) of the Federal Power Act), in consultation with each regional entity (as that term is defined in section 215(a)(7) of such Act) and each transmitting utility (as that term is defined in section 3(23) of such Act) that has facilities interconnected with a transmitting utility in a neighboring transmission planning region, shall conduct a study of total transfer capability as defined in section 37.6(b)(1)(vi) of title 18, Code of Federal Regulations, between transmission planning regions that contains the following: ####
(1)Current total transfer capability, between each pair of neighboring transmission planning regions. ####
(2)A recommendation of prudent additions to total transfer capability between each pair of neighboring transmission planning regions that would demonstrably strengthen reliability within and among such neighboring transmission planning regions. ####
(3)Recommendations to meet and maintain total transfer capability together with such recommended prudent additions to total transfer capability between each pair of neighboring transmission planning regions. ###
(b)Publication Not later than 18 months after the date of enactment of this Act, the North American Electric Reliability Corporation shall deliver a study to Federal Energy Regulatory Commission, which shall publish the study required in subsection
(a)in the Federal Register and seek public comments. ###
(c)Report Not later than 12 months after the end of the public comment period in subsection (b), the Federal Energy Regulatory Commission shall submit a report on its conclusions to Congress and include recommendations, if any, for statutory changes.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.