Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · STATUTE-COMPILATIONS · National Defense Authorization Act for Fiscal Year 2022 · Sec. 1013

Sec. 1013. CODIFICATION OF REQUIREMENT FOR ASSESSMENTS PRIOR TO START OF CONSTRUCTION ON FIRST SHIP OF A SHIPBUILDING PROGRAM

729 words·~3 min read·/statute-compilations/comps-16861/sec-1013

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

## SEC. 1013 CODIFICATION OF REQUIREMENT FOR ASSESSMENTS PRIOR TO START OF CONSTRUCTION ON FIRST SHIP OF A SHIPBUILDING PROGRAM ###
(a)In General Chapter 863 of title 10, United States Code, is amended by inserting after section 8669b the following new section: > > ## “SEC. 8669c Assessments required prior to start of construction on first ship of a shipbuilding program > > **[**[10 U.S.C. 8669c](/us/usc/t10/s8669c)**]** > > > ### “(a) In General > > The Secretary of the Navy may not approve the start of construction of the first ship for any major shipbuilding program until a period of 30 days has elapsed following the date on which the Secretary— > > > #### “(1) > > submits a report to the congressional defense committees on the results of any production readiness review; > > > #### “(2) > > certifies to the congressional defense committees that the findings of any such review support commencement of construction; and > > > #### “(3) > > certifies to the congressional defense committees that the basic and functional design of the vessel is complete. > > > ### “(b) Report > > The report required by subsection (a)(1) shall include, at a minimum, an assessment of each of the following: > > > #### “(1) > > The maturity of the ship’s design, as measured by stability of the ship contract specifications and the degree of completion of detail design and production design drawings. > > > #### “(2) > > The maturity of developmental command and control systems, weapon and sensor systems, and hull, mechanical and electrical systems. > > > #### “(3) > > The readiness of the shipyard facilities and workforce to begin construction. > > > #### “(4) > > The Navy’s estimated cost at completion and the adequacy of the budget to support the estimate. > > > #### “(5) > > The Navy’s estimated delivery date and description of any variance to the contract delivery date. > > > #### “(6) > > The extent to which adequate processes and metrics are in place to measure and manage program risks. > > > ### “(c) Definitions > > For the purposes of subsection (a): > > > #### “(1) Basic and functional design > > The term ‘basic and functional design’, when used with respect to a vessel, means design through computer aided models, that— > > > ##### “(A) > > fixes the major hull structure of the vessel; > > > ##### “(B) > > sets the hydrodynamics of the vessel; and > > > ##### “(C) > > routes major portions of all distributive systems of the vessel, including electricity, water, and other utilities. > > > #### “(2) First ship > > The term ‘first ship’ applies to a ship if— > > > ##### “(A) > > the ship is the first ship to be constructed under that shipbuilding program; or > > > ##### “(B) > > the shipyard at which the ship is to be constructed has not previously started construction on a ship under that shipbuilding program. > > > #### “(3) Major shipbuilding program > > The term ‘major shipbuilding program’ means a program for the construction of combatant and support vessels required for the naval vessel force, as reported within the annual naval vessel construction plan required by section 231 of this title. > > > #### “(4) Production readiness review > > The term ‘production readiness review’ means a formal examination of a program prior to the start of construction to determine if the design is ready for production, production engineering problems have been resolved, and the producer has accomplished adequate planning for the production phase. > > > #### “(5) Start of construction > > The term ‘start of construction’ means the beginning of fabrication of the hull and superstructure of the ship.” > . ###
(b)Clerical Amendment **[**[10 U.S.C. 8661](/us/usc/t10/s8661)**]** The table of sections at the beginning of such chapter is amended by inserting after the item relating to section 8669b the following new item:" “8669c. Assessments required prior to start of construction on first ship of a shipbuilding program.” ". ###
(c)Conforming Repeal Section 124 of the National Defense Authorization Act for Fiscal Year 2008 (Public Law 110-181; 122 Stat. 28; 10 U.S.C. 8661 note) is repealed.
Connectionstraces to 2
2 references not yet in our index
  • Pub. L. 110-181
  • 122 Stat. 28
Citation graph
cites case law
Sec. 1013
CODIFICATION OF REQUIREMENT FOR ASSESSMENTS PRIOR TO START OF CONSTRUCTION ON FIRST SHIP OF A SHIPBUILDING PROGRAM
Pub. L.Pub. L. 110-181
Stat.122 Stat. 28
Cites 4Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.