Sec. 40335. AUTHORITY FOR PUMPED STORAGE HYDROPOWER DEVELOPMENT USING MULTIPLE BUREAU OF RECLAMATION RESERVOIRS
134 words·~1 min read·
/statute-compilations/comps-16776/sec-40335A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 40335 AUTHORITY FOR PUMPED STORAGE HYDROPOWER DEVELOPMENT USING MULTIPLE BUREAU OF RECLAMATION RESERVOIRS Section 9(c) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c)) is amended— ####
(1)in paragraph (1), in the fourth sentence, by striking “, including small conduit hydropower development” and inserting “and reserve to the Secretary the exclusive authority 135 STAT. 1026 to develop small conduit hydropower using Bureau of Reclamation facilities and pumped storage hydropower exclusively using Bureau of Reclamation reservoirs”; and ####
(2)in paragraph (8), by striking “has been filed with the Federal Energy Regulatory Commission as of the date of the enactment of the Bureau of Reclamation Small Conduit Hydropower Development and Rural Jobs Act” and inserting “was filed with the Federal Energy Regulatory Commission before August 9, 2013, and is still pending”.
Connectionstraces to 1
Traces to 1 document
Citation graph
cites case law
Sec. 40335
AUTHORITY FOR PUMPED STORAGE HYDROPOWER DEVELOPMENT USING MULTIPLE BUREAU OF RECLAMATION RESERVOIRS
Cites 1Cited by 0 across 0 sources