Sec. 146. LIMITATION ON AVAILABILITY OF FUNDS FOR VC-25B AIRCRAFT
221 words·~1 min read·
/statute-compilations/comps-15772/sec-146A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 146 LIMITATION ON AVAILABILITY OF FUNDS FOR VC-25B AIRCRAFT ###
(a)Limitation Except as provided in subsection (b), none of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2020 or any subsequent fiscal year for the Air Force may be obligated or expended to carry out over and above work on the VC-25B aircraft until a period of 30 days has elapsed following the date on which the Secretary of the Air Force notifies the congressional defense committees of the intent of the Secretary to authorize such work. ###
(b)Exception The limitation under subsection
(a)shall not apply to over and above work carried out— ####
(1)to repair or replace items damaged during the testing of the VC-25B aircraft; or ####
(2)to make changes necessary to meet operational requirements. ###
(c)Definitions In this section: ####
(1)The term “operational requirements” means any of the operational requirements for the VC-25B aircraft described in the capability development document or the system requirements document for the Presidential Aircraft Recapitalization Program. ####
(2)The term “over and above work” means work performed pursuant to line 0012 (CLIN 0012) of the contract for Presidential Aircraft Recapitalization entered into between the Department of the Air Force and the Boeing Company (contract number FA8625-16-C-6599).