Sec. 119E. None of the funds made available by this Act and apportioned under section 47114(d) of title 49, United States Code, shall be made available for construction of a storage building, or a portion of such building, to shelter snow equipment in excess of equipment needs established by standards issued by the Secretary of Transportation that is owned by an airport categorized as a local general aviation airport as indicated in Federal Aviation Administration 2017- 2021 National Plan of Integrated Airport Systems (NPIAS) report unless such airport sponsor certifies conformity with the following:
254 words·~1 min read·
/statute-compilations/comps-15486/sec-119eA research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## Sec. 119E None of the funds made available by this Act and apportioned under section 47114(d) of title 49, United States Code, shall be made available for construction of a storage building, or a portion of such building, to shelter snow equipment in excess of equipment needs established by standards issued by the Secretary of Transportation that is owned by an airport categorized as a local general aviation airport as indicated in Federal Aviation Administration 2017- 2021 National Plan of Integrated Airport Systems (NPIAS) report unless such airport sponsor certifies conformity with the following: ####
(1)The storage building, or portion thereof, to be constructed will be used to store snow removal equipment exclusively used for clearing airfield pavement of snow and ice following a weather event. ####
(2)The 30-year annual snowfall normal of the nearest weather station based on the National Oceanic and Atmospheric Administration Summary of Monthly Normals 1981-2010 exceeds 26 inches. ####
(3)The airport serves as a base for a medical air ambulance transport aircraft; (d)that the airport master record (Form 5010-1) effective on September 14, 2017 for the airport indicates 45 based aircraft consisting of single engine, multiple engine, and jet engine aircraft. ####
(4)The airport sponsor will complete design of the storage building not later than fiscal year 2018 and initiate construction of the storage building not later than fiscal year 2019. ####
(5)The area of the storage building, or portion thereof, to be funded under this section shall not exceed 6,000 square feet.