Sec. 1086. PENSACOLA, FLORIDA
106 words·~1 min read·
/statute-compilations/comps-1422/sec-1086A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 1086 PENSACOLA, FLORIDA ###
(a)Study The Secretary shall conduct a study of the feasibility of constructing, in accordance with standards applicable to Interstate System highways, a 4-lane highway connecting Interstate Route 65 and Interstate Route 10 in the vicinity of Pensacola, Florida. ###
(b)Report Not later than 2 years after the date of the enactment of this Act, the Secretary shall transmit to Congress a report on the results of the study conducted under this section, together with recommendations for the location of a corridor in which to construct the highway described in subsection (a). * * * * * * *