Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · STATUTE-COMPILATIONS · Water Infrastructure Improvements for the Nation Act · Sec. 1319

Sec. 1319. NEW SAVANNAH BLUFF LOCK AND DAM, GEORGIA AND SOUTH CAROLINA

727 words·~3 min read·/statute-compilations/comps-13821/sec-1319

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

## SEC. 1319 NEW SAVANNAH BLUFF LOCK AND DAM, GEORGIA AND SOUTH CAROLINA ###
(a)Definitions In this section, the following definitions apply: ####
(1)New savannah bluff lock and dam The term “**New Savannah Bluff Lock and Dam**” means— #####
(A)the lock and dam at New Savannah Bluff, Savannah River, Georgia and South Carolina; and #####
(B)the appurtenant features to the lock and dam, including— ######
(i)the adjacent approximately 50-acre park and recreation area with improvements made under the project for navigation, Savannah River below Augusta, Georgia, authorized by the first section of the Act of July 3, 1930 (46 Stat. 924), and the first section of the Act of August 30, 1935 (49 Stat. 1032); and ######
(ii)other land that is part of the project and that the Secretary determines to be appropriate for conveyance under this section. ####
(2)Project The term “**Project**” means the project for navigation, Savannah Harbor expansion, Georgia, authorized by section 7002(1) of the Water Resources Reform and Development Act of 2014 (Public Law 113-121; 128 Stat. 1364). ###
(b)Deauthorization ####
(1)In general Effective beginning on the date of enactment of this Act— #####
(A)the New Savannah Bluff Lock and Dam is deauthorized; and #####
(B)notwithstanding section 348(l)(2)(B) of the Water Resources Development Act of 2000 (Public Law 106-541; 114 Stat. 2630; 114 Stat. 2763A-228) (as in effect on the day before the date of enactment of this Act) or any other provision of law, the New Savannah Bluff Lock and Dam shall not be conveyed to the city of North Augusta and Aiken County, South Carolina, or any other non-Federal entity. ####
(2)Repeal Section 348 of the Water Resources Development Act of 2000 (Public Law 106-541; 114 Stat. 2630; 114 Stat. 2763A-228) is amended— #####
(A)by striking subsection (l); and #####
(B)by redesignating subsections
(m)and
(n)as subsections
(l)and (m), respectively. ###
(c)Project Modifications ####
(1)In general Notwithstanding any other provision of law, the Project is modified to include— #####
(A)full repair of the New Savannah Bluff Lock and Dam structure; #####
(B)modification of the structure such that the structure is able to maintain a stable pool with the same daily average elevation as is achieved by the existing structure, as measured at both the United States Geological Survey Gage 02196999, located at the New Savannah Bluff Lock and Dam, and the United States Geological Survey Gage 02196670, located in the vicinity of the Fifth Street Bridge, Augusta, Georgia, which at the New Savannah Bluff Lock and Dam is between 114.5 and 115 feet National Geodetic Vertical Datum of 1929 (NGVD29); #####
(C)construction of a fish passage structure as recommended in the report of the Chief of Engineers for the Project, dated August 17, 2012, or such other Project feature that appropriately mitigates impacts to fish habitat caused by the Project without removing the dam; and #####
(D)conveyance by the Secretary to Augusta-Richmond County, Georgia, of the park and recreation area adjacent to the New Savannah Bluff Lock and Dam, without consideration. ####
(2)Cost share #####
(A)In general The costs of construction of a Project feature constructed pursuant to paragraph
(1)shall be determined in accordance with section 101(a)(1)(B) of the Water Resources Development Act of 1986 (33 U.S.C. 2211(a)(1)(B)). #####
(B)Savings provision Any increase in costs for the Project due to the construction of a Project feature constructed pursuant to paragraph
(1)shall not be included in the total project cost for purposes of section 902 of the Water Resources Development Act of 1986 (33 U.S.C. 2280). #####
(C)Ceiling The costs of construction to be paid by the Georgia Ports Authority as a non-Federal interest for the Project for the modifications authorized under paragraph
(1)shall not exceed the costs that would be paid by such non-Federal interest for construction of the fish passage structure recommended in the report of the Chief of Engineers for the Project, dated August 17, 2012. ####
(3)Operation and maintenance costs The Federal share of the costs of operation and maintenance of any Project feature constructed pursuant to paragraph
(1)shall be consistent with the cost sharing of the fish passage structure as recommended in the report of the Chief of Engineers for the Project, dated August 17, 2012.
Connectionstraces to 3
5 references not yet in our index
  • 46 Stat. 924
  • 49 Stat. 1032
  • 128 Stat. 1364
  • Pub. L. 106-541
  • 114 Stat. 2630
Citation graph
cites case law
Sec. 1319
NEW SAVANNAH BLUFF LOCK AND DAM, GEORGIA AND SOUTH CAROLINA
Stat.46 Stat. 924
Stat.49 Stat. 1032
Stat.128 Stat. 1364
Pub. L.Pub. L. 106-541
Stat.114 Stat. 2630
Cites 8Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.