Sec. 1185. TABLE ROCK LAKE, ARKANSAS AND MISSOURI
370 words·~2 min read·
/statute-compilations/comps-13821/sec-1185A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 1185 TABLE ROCK LAKE, ARKANSAS AND MISSOURI ###
(a)In general Notwithstanding any other provision of law, the Secretary— ####
(1)shall include a 60-day public comment period for the Table Rock Lake Master Plan and Table Rock Lake Shoreline Management Plan revision; and ####
(2)shall finalize the revision for the Table Rock Lake Master Plan and Table Rock Lake Shoreline Management Plan during the 2-year period beginning on the date of enactment of this Act. ###
(b)Shoreline Use Permits During the period described in subsection (a)(2), the Secretary shall lift or suspend the moratorium on the issuance of new, and modifications to existing, shoreline use permits based on the existing Table Rock Lake Master Plan and Table Rock Lake Shoreline Management Plan. ###
(c)Oversight Committee ####
(1)In general Not later than 120 days after the date of enactment of this Act, the Secretary shall establish an oversight committee (referred to in this subsection as the “Committee”). ####
(2)Purposes The purposes of the Committee shall be— #####
(A)to review any permit to be issued under the existing Table Rock Lake Master Plan at the recommendation of the District Engineer; and #####
(B)to advise the District Engineer on revisions to the new Table Rock Lake Master Plan and Table Rock Lake Shoreline Management Plan. ####
(3)Membership The membership of the Committee shall not exceed 6 members and shall include— #####
(A)not more than 1 representative each from the State of Missouri and the State of Arkansas; #####
(B)not more than 1 representative each from local economic development organizations with jurisdiction over Table Rock Lake; and #####
(C)not more than 1 representative each representing the boating and conservation interests of Table Rock Lake. ####
(4)Study The Secretary shall— #####
(A)carry out a study on the need to revise permit fees relating to Table Rock Lake to better reflect the cost of issuing those permits and achieve cost savings; #####
(B)submit to Congress a report on the results of the study described in subparagraph (A); and #####
(C)begin implementation of a new permit fee structure based on the findings of the study described in subparagraph (A).