Sec. 814. IMPROVEMENT IN DEFENSE DESIGN-BUILD CONSTRUCTION PROCESS
119 words·~1 min read·
/statute-compilations/comps-11977/sec-814A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 814 IMPROVEMENT IN DEFENSE DESIGN-BUILD CONSTRUCTION PROCESS Section 2305a of title 10, United States Code, is amended by striking the second sentence of subsection
(d)and inserting the following: “If the contract value exceeds $4,000,000, the maximum number specified in the solicitation shall not exceed 5 unless the head of the contracting activity, delegable to a level no lower than the senior contracting official within the contracting activity, approves the contracting officer’s justification with respect to an individual solicitation that a number greater than 5 is in the Federal Government’s interest. The contracting officer shall provide written documentation of how a maximum number exceeding 5 is consistent with the purposes and objectives of the two-phase selection procedures.”.