Sec. 605. WILDFIRE RESILIENCE PROJECTS

779 words·~4 min read·/statute-compilations/comps-1123/sec-605

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

## SEC. 605 WILDFIRE RESILIENCE PROJECTS **[**[16 U.S.C. 6591d](/us/usc/t16/s6591d)**]** ###
(a)In General Hazardous fuels reduction projects, as defined in the Healthy Forests Restoration Act of 2003 (16 U.S.C. 6511(2)) may be— ####
(1)carried out in accordance with subsections (b), (c), and
(d)of section 102 and sections 104 and 105; ####
(2)considered an action categorically excluded from the requirements of Public Law 91–190 (42 U.S.C. 4321 et seq.); and ####
(3)exempt from the special administrative review process under section 105. ###
(b)Collaborative Restoration Project ####
(1)In general A project referred to in subsection
(a)is a project to carry out forest restoration treatments that— #####
(A)maximizes the retention of old-growth and large trees, as appropriate for the forest type, to the extent that the trees promote stands that are resilient to insects and disease, and reduce the risk or extent of, or increase the resilience to, wildfires; #####
(B)considers the best available scientific information to maintain or restore the ecological integrity, including maintaining or restoring structure, function, composition, and connectivity; and #####
(C)is developed and implemented through a collaborative process that— ######
(i)includes multiple interested persons representing diverse interests; and ######
(ii)######
(I)is transparent and nonexclusive; or ######
(II)meets the requirements for a resource advisory committee under subsections
(c)through
(f)of section 205 of the Secure Rural Schools and Community Self-Determination Act of 2000 (16 U.S.C. 7125). ####
(2)Inclusion A project under this subsection may carry out part of a proposal that complies with the eligibility requirements of the Collaborative Forest Landscape Restoration Program under section 4003(b) of the Omnibus Public Land Management Act of 2009 (16 U.S.C. 7303(b)). ###
(c)Limitations ####
(1)Project size A project under this section may not exceed 3000 acres. ####
(2)Location A project under this section shall be— #####
(A)Prioritized within the wildland-urban interface; #####
(B)If located outside the wildland-urban interface, limited to areas within Condition Classes 2 or 3 in Fire Regime Groups I, II, or III that contain very high wildfire hazard potential; and #####
(C)Limited to areas designated under section 602(b) as of the date of enactment of this Act. ####
(3)Roads #####
(A)Permanent roads ######
(i)Prohibition on establishment A project under this section shall not include the establishment of permanent roads. ######
(ii)Existing roads The Secretary may carry out necessary maintenance and repairs on existing permanent roads for the purposes of this section. #####
(B)Temporary roads The Secretary shall decommission any temporary road constructed under a project under this section not later than 3 years after the date on which the project is completed. ####
(4)Extraordinary circumstances The Secretary shall apply the extraordinary circumstances procedures under section 220.6 of title 36, 2code of Federal regulations (or successor regulations), when using the categorical exclusion under this section. 2So in law. The reference to “code of Federal regulations” should be a reference to “Code of Federal Regulations”. ###
(d)Exclusions This section does not apply to— ####
(1)a component of the National Wilderness Preservation System; ####
(2)any Federal land on which, by Act of Congress or Presidential proclamation, the removal of vegetation is restricted or prohibited; ####
(3)a congressionally designated wilderness study area; or ####
(4)an area in which activities under subsection
(a)would be inconsistent with the applicable land and resource management plan. ###
(e)Forest Management Plans All projects and activities carried out under this section shall be consistent with the land and resource management plan established under section 6 of the Forest and Rangeland Renewable Resources Planning Act of 1974 (16 U.S.C. 1604) for the unit of the National Forest System containing the projects and activities. ###
(f)Public Notice and Scoping The Secretary shall conduct public notice and scoping for any project or action proposed in accordance with this section. ###
(g)Accountability ####
(1)In general The Secretary shall prepare an annual report on the use of categorical exclusions under this section that includes a description of all acres (or other appropriate unit) treated through projects carried out under this section. ####
(2)Submission Not later than 1 year after the date of enactment of this section, and each year thereafter, the Secretary shall submit the reports required under paragraph
(1)to— #####
(A)the Committee on Agriculture, Nutrition, and Forestry of the Senate; #####
(B)the Committee on Environment and Public Works of the Senate; #####
(C)the Committee on Agriculture of the House of Representatives; #####
(D)the Committee on Natural Resources of the House of Representatives; and #####
(E)the Government Accountability Office.
Connectionstraces to 6
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.