Sec. 413. WESTERN INTEGRATED COAL GASIFICATION DEMONSTRATION PROJECT
225 words·~1 min read·
/statute-compilations/comps-10914/sec-413A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 413 WESTERN INTEGRATED COAL GASIFICATION DEMONSTRATION PROJECT **[**[42 U.S.C. 15973](/us/usc/t42/s15973)**]** ###
(a)In General Subject to the availability of appropriations, the Secretary shall carry out a project to demonstrate production of energy from coal mined in the western United States using integrated gasification combined cycle technology (referred to in this section as the “demonstration project”). ###
(b)Components The demonstration project— ####
(1)may include repowering of existing facilities; ####
(2)shall be designed to demonstrate the ability to use coal with an energy content of not more than 9,000 Btu/lb.; and ####
(3)shall be capable of removing and sequestering carbon dioxide emissions. ###
(c)All Types of Western Coals Notwithstanding the foregoing, and to the extent economically feasible, the demonstration project shall also be designed to demonstrate the ability to use a variety of types of coal (including subbituminous and bituminous coal with an energy content of up to 13,000 Btu/lb.) mined in the western United States. ###
(d)Location The demonstration project shall be located in a western State at an altitude of greater than 4,000 feet above sea level. ###
(e)Cost Sharing The Federal share of the cost of the demonstration project shall be determined in accordance with section 988. ###
(f)Loan Guarantees Notwithstanding title XIV, the demonstration project shall not be eligible for Federal loan guarantees.