46A-10A-79. Apportionment of original cost to annexed area when project extended.
53 words·~1 min read·
/sd/title-46/chapter-46-10/46a-10a-79A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
If an existing drainage project is extended or enlarged, the board or boards shall apportion the benefits resulting to the annexed area from the existing construction in the original project as a cost to be absorbed by the lands of the annexed area on the basis of the original cost of the drain.